1
/
of
6
EnglishCaliGenetics.co.uk
220v Professional OEM food/fruit mushroom tomato vegetable dehydrator machine
220v Professional OEM food/fruit mushroom tomato vegetable dehydrator machine
Regular price
£1,007.47 GBP
Regular price
£0.00 GBP
Sale price
£1,007.47 GBP
Taxes included.
Quantity
Couldn't load pickup availability
Products Description
Contact us for more videos and details.
1. We are a manufacturers, and all product certifications are linked to our factory.
2. We know more about the products and can get more professional answers. Delivery is more guaranteed and timely(Generally, we can ship within 48 hours after you pay). Can solve any problems for you instantly.
3.10 years of production experience makes our production capacity strong, and has a stable supply chain and production system.With better R & D capabilities, it can quickly manufacture various customized machines.Welcome large or small volume OEM / OEM.
4. Cooperate with big brands from many countries and have experience selling to Europe, North America, South America, Asia,Africa, Middle East and other regions, making the transaction smoother MODEL:ST-32
1. Mechanical knob control, easy operation, low damage rate of parts
2. Independent design of two cabinets, temperature and time can be set respectively
3. 2 motor +2 fan system per cabinet, better effect and higher efficiency
4. Transparent tempered glass, which can observe the drying inside
5. 32 trays large capacity, can put 40~55 kg at a time
6. Thickened 0.8mm, brushed stainless steel shell. 304 food grade trays.
7. The trays size is 40X40cm, and the trays spacing of each trays is 3cm
8. Timing range: 0~15 hours with normal opening function, temperature setting range: 40~90℃ (104~194℉)
9. You can bake fruits, vegetables, meat, grains, herbs, beans, snacks, etc
Product Paramenters
|
Item NO.
|
ST-32
|
|
Product Dimension (W X D X H )
|
596X420X1460mm
|
|
wooden case Dimension (W X D X H )
|
700 X 497 X 1515mm(Carton)
730 X 497 X 1515mm(Plywoodcase)
|
|
Rack Size(L X W)
|
396X396mm
|
|
Rack Grid Spacing
|
8mm
|
|
Upper and Lower Rack Gap
|
35mm
|
|
Total Trays
|
32 trays
|
|
N.W (KGS)
|
50kgs
|
|
G.W (KGS)
|
90kgs
|
|
|
Food grade 304 stainless steel racks;
201 stainless steel housing, lifting handles, latches;
Tempered glass windowdoor;Aluminum alloy door handle;
Control panel with PVC finish and PF knobs
|
|
Power
|
3150W
|
|
Voltage / Frequency
|
|
|
Temperature Ranges
|
40~90℃ (104~194℉)
|
|
Max. Timing
|
15hrs
|
|
Noise Level
|
55dB
|
|
Capacity
|
220L
|
|
Warranty
|
1 year warranty / Provide techinicial support according to specific issues; / Provide FOC vulnerable parts
|
|
Packages
|
EPE cushion
Normalpaacking : High strength corrugated carton
Special packing : non-fumigation plywood case(extra cost US$32 ) 710 X1515 X500mm
B/W printing manual
|
|
Notes
|
1. Other special requirement shall be added to related cost
2.MOQ: 20GP container, can mix models. Extra sample fee will pay back after a 20GP.
3. Lead Time: For first order 35 days, and the repeated order 30 days after all OEM artworks confirmed.
4. Payment Term: T/T 30% deposit, the balance shall be paid one week
before shipment.
5. Certs: CE
|
Details Images
ODM project process
ODM project process
1.Communication Requirements: Customer provide sample or design paper with details requirements.
2.factory quoting: quotation is passed by customer and factory provide die design.
3.making prototype: within 5-7days, provide the 1:1 mock-up
4.confirmation of prototype: customer confirm the 1:1 mock-up after several adjustment
5.Opening mould. Produce the mould according to the confirmation of 1:1 mock-up,takes around 1-2months
6.testing mould. Try the mould repeatedly and make sure there is no flaws on finished products.
7.Trial production. Small mass production after passing the mould testing and do fully product test
8.Mass production. Start mass production after passing the trial production, and customer pay the deposit.
9.Inpection&delivery. Delivery within 4 weeks, customer arrange the balance payment.
Our company has perfect equipment and high-quality technical team, can customize products according to customer requirements.
2.factory quoting: quotation is passed by customer and factory provide die design.
3.making prototype: within 5-7days, provide the 1:1 mock-up
4.confirmation of prototype: customer confirm the 1:1 mock-up after several adjustment
5.Opening mould. Produce the mould according to the confirmation of 1:1 mock-up,takes around 1-2months
6.testing mould. Try the mould repeatedly and make sure there is no flaws on finished products.
7.Trial production. Small mass production after passing the mould testing and do fully product test
8.Mass production. Start mass production after passing the trial production, and customer pay the deposit.
9.Inpection&delivery. Delivery within 4 weeks, customer arrange the balance payment.
Our company has perfect equipment and high-quality technical team, can customize products according to customer requirements.
Share
